Which vendors can use water or recovered heat as the source?
19 vendors document equipment that can deliver hot water using a water loop, brine or recovered heat. Start with the source fluid and usable flow, then compare the cited equipment against the hot-water temperatures and temperature lift your process needs. Examples include Copeland / Vilter, Energy Machines and Everllence.
| Copeland / Vilter | Vilter VQ95 | Water-to-water | 1–5 MW on one skid | — | District heating and industrial process heat | 2026-11-28 |
|---|---|---|---|---|---|---|
| Energy Machines | EMT 1380-1-4-ECO | Water-to-water | — | — | Ground, water and waste-heat recovery | 2026-11-28 |
| Everllence | TCC HPU28 | Water-to-water | — | 1501 | District heating | 2026-11-28 |
| Fenagy | H-600 (H-range) | Air-to-water and Water-to-water | 600 kW (catalog capacity per unit) | 851 | District heating and process heat | 2026-11-28 |
| Flow Environmental Systems | ANSWR Model C | Air- or water-to-water | — | 82.22 | Space heating, cooling and domestic hot water | 2026-11-28 |
| Friotherm | Unitop | Water-to-water | 3–35 MW across custom single- and two-stage systems | 1201 | District heating | 2026-11-28 |
| Galletti | WBE | Water-to-water | 45–220 kW (family catalog range) | 901 | Hot-water booster | 2026-11-28 |
| HEATEN | HeatBooster HBL4-W/W | Water-to-water | 0.8–2.5 MW thermal, HBL4-W/W envelope | 2001 | Industrial waste-heat recovery | 2026-11-28 |
| HiRef | KSW | Water-to-water | Up to 180 kW (single circuit) | 802 | Domestic hot water and retrofit emitters | 2026-11-28 |
| Johnson Controls / Sabroe | HitemHP | Waste heat-to-water | 100–1,000 kW across the range | 1221 | Pasteurisation, sterilisation and indirect steam | 2026-11-28 |
| Mitsubishi Heavy Industries Thermal Systems | ETW-S | Water-to-water | — | 1301 | Process drying and sterilization | 2026-11-28 |
| OCHSNER Energietechnik | IWWDS 430 R4b | Water-to-water | 500 kW heat supply capacity in Annex 58 exhibit | 1301 | Industrial process heat and district heating | 2026-11-28 |
| Oilon | ChillHeat P30–P450 | Waste heat-to-water | 30–450 kW at B0/W35 with R134a | 1203 | District heating and industrial heat recovery | 2026-11-28 |
| Rank ORC | HP (HTHP series) | Brine-to-water | 250–600 kW (portal thermal capacities; model-specific rating point unpublished) | 1501 | Process heat and steam | 2026-11-28 |
| SCM Frigo | SMART SHP W110 | Water-to-water | — | 854 | Geothermal and process heat recovery | 2026-11-28 |
| Siemens Energy | High-temperature industrial heat pump | Waste heat-to-water | Up to 70 MW thermal | 1501 | District heating and industrial process heat | 2026-11-28 |
| SKADEC | SH.F. R600 | Water-to-water | 400–2,200 kW (SH.F. catalog heating range) | 903 | Industrial hot-water production | 2026-11-28 |
| Star Refrigeration | Water Source Neatpump | Water-to-water | 700 kW–10 MW thermal modular range | 1301 | District heating and steam raising | 2026-11-28 |
| Waterkotte | Industrial Line 8060.7 | Brine-to-water and Water-to-water | Up to 60 kW (catalog unit maximum) | — | Commercial heating, cooling and hot water | 2026-11-28 |
Send your peak heating load, heat source, supply and return temperatures, project location, electrical supply and target delivery date.
Request quotes at your design point
One brief, several replies: Commercial Heat Pump Vendors forwards it to the heat pump suppliers that fit and they answer you directly.
Brief received by Commercial Heat Pump Vendors. Matching heat pump suppliers reply to your inbox.
We couldn't send your request through Commercial Heat Pump Vendors. Check your email address and try again, or write to hello@commercialheatpumpvendors.com.
Questions for your RFQ
What source conditions should I give a vendor?
Give the source fluid, flow rate, entering temperature range and minimum acceptable leaving temperature. Include fouling and water quality requirements for heat exchanger selection.
What does temperature lift mean?
Temperature lift describes the gap the heat pump must bridge between the source and the useful heat delivery temperature. Give the vendor both fluid temperature pairs for a selection.
Can I use waste heat that varies with production?
Yes, when the source can supply enough heat during the hours your process needs it. Send the vendor a load profile and a source profile so they can propose buffering or a backup heat source.